My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rA A <br /> N O <br /> CD <br /> 0 College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> 3 � <br /> m Implementation&Verification <br /> Mitigation Measure TiminglSchedule Implementation <br /> Responsibility Action Date <br /> Competed <br /> a• biologist within the 2 weeks before construction <br /> c or tree removal begins.If no active nests are <br /> N found no further mitigation shall be required. <br /> m < If active nests are found,impacts shall be <br /> avoided by establishment of appropriate buffers. <br /> No project activity shall commence within the <br /> buffer area until a qualified biologist confutes <br /> mthat the nest is no longer active.DFG guidelines <br /> recommend implementation of 0.25-or 0.5-mile <br /> buffers,but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine it <br /> would not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> may be required if the activity has potential to <br /> adversely affect the nest. <br /> Burrowing Owl Before construction SJCOG,in <br /> < Before project activity,focused surveys for consultation with DFG <br /> burrowing owls shall be conducted by a qualified <br /> m biologist in areas of suitable habitat on and <br /> o within 250 feet of the project site. Surveys shall <br /> M be conducted in accordance with DFG protocols <br /> (DFG 1995). <br /> o < If no occupied burrows are found in the survey <br /> area,a letter report documenting survey methods <br /> and findings shall be submitted to DFG,and no <br /> n further mitigation is necessary. <br /> W < If an occupied burrow with an active nest is <br /> found,impacts shall be minimi ed by <br /> establishing a 250-foot buffer area around the <br /> burrow.No project activity shall occur within the <br /> 3 o buffer area until a qualified biologist confirms <br /> that the nest is no longer active.The size of the <br /> buffer area may be adjusted if a qualified <br />
The URL can be used to link to this page
Your browser does not support the video tag.