Laserfiche WebLink
M <br /> D <br /> g College Park at Mountain House Specific Plan III <br /> 3 <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Responsibility Action Date <br /> Completed <br /> o at least 5 consecutive days from the time of the <br /> observation,to allow any kit fox occupying the <br /> den to move to another location. If it is not a natal <br /> :Z or pupping den,use of the den can be discouraged <br /> during this period by partially plugging its <br /> 0 <br /> entrance(s)with soil in such a manner that any <br /> uD animal can escape easily. The den may be <br /> 3 destroyed when, in the judgment of a qualified <br /> biologist,it is no longer occupied by a kit fox or it <br /> is temporarily vacant. Methods for den destruction <br /> shall be in accordance with USFWS <br /> recommendations. <br /> c < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS. A 250-foot buffer zone shall be <br /> o maintained around natal dens until the biologist <br /> determines that the den has been vacated. <br /> Additional provisions of the Standardized <br /> Recommendations for Protection of the San <br /> RL Joaquin Kit Fox Before or During Ground <br /> Disturbance(USFWS 1999), including those <br /> for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> c for kit fox occupation during construction, <br /> shall also be implemented. <br /> dCl) Jurisdictional Waters of the United States Before Construction SJCOG,in <br /> n < The College Park Developers shall implement coordination with <br /> Mitigation Measure 4.10-10. DFG,USACE and/or <br /> RWQCB <br /> B 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />