rA 0 <br /> W 0 <br /> 0 College Park at Mountain House Speciflc Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> v <br /> Implementation&Verification <br /> o Implementation <br /> o Mitigaton Measure Timing/Schedule ResponsibilityT Action Date <br /> Completed <br /> �• 4.13. NOISE <br /> c 4.13-1 Noise Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the <br /> co < Limit project construction activities to the hours developer <br /> between 6:00 a.m. and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds,in accordance with manufacturers' <br /> recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> v installed around stationary equipment,if <br /> necessary. <br /> 0 <br /> 4.13-2 Noise--Generation of New Stationary-Source During design phase SJCCDD, in <br /> Noise and during conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> identified below into the project design. \ <br /> m <br /> CX Commercial,Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> v exceedance of 55 dBA Lis during daytime hours <br /> M (7:00 a.m to 10:00 p.m.)or 50 dBA L,,during <br /> 3 nighttime hours(10:00 p.m to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />