Laserfiche WebLink
gm <br /> � v <br /> n <br /> oCollege Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> 0 <br /> 2. Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> n 4.134 Noise--Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels conjunction with the <br /> o The College Park developers shall implement the developer; in <br /> }. following measures: consultation with a <br /> o < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> othe fust residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIP, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment The noise barrier may consist of a wall, <br /> berm,or combination thereof The exact location, <br /> `-" height and character of the sound barrier shall be <br /> rn <br /> determined by a noise consultant approved by the <br /> County. The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> below 65 dBA Ld�/CNEL and as close to 60 dBA <br /> m Ld�/CNEL as feasible. This mitigation shall be <br /> Wfunded through fair-share payments by the <br /> d College Park developers. <br /> 0 <br /> c <br /> d <br /> 2 <br /> v7 <br /> 0 <br /> d m <br /> � m <br /> rn <br /> d D <br /> a 'D <br /> c <br /> n <br /> C7 -O <br /> O y <br /> �C: <br />