Laserfiche WebLink
d <br /> m College Park at Mountain House Specific Plan HI <br /> c. Mitigation Monitoring and Reporting Program <br /> 0m Implementation&Verification <br /> 0 Implementation <br /> c Mitigation Measure Timing/Schedule <br /> Date <br /> Responsibility Action Com <br /> pleted <br /> ° 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> Er <br /> x Mountain House Parkway construction <br /> HThe following measures shall be implemented by the <br /> CD College Park developers: <br /> m < If the landscaping and edge treatments required <br /> by the MHMP and MHCSD Design Manual have <br /> v not been developed on the east side of Mountain <br /> j House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property, the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west-facing pond berm shall be densely landscaped <br /> g by the College Park developers.In addition,the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> M development of the pond. <br /> 0 <br /> m <br /> n <br /> m <br /> 0 <br /> .D <br /> My <br />