Laserfiche WebLink
M <br /> n' D <br /> oCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o <br /> Implementation 6 Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> m <br /> Completed <br /> a requirements from the County Environmental <br /> :;a Health Department.Dairy waste ponds or any <br /> other sources of contamination shall be removed <br /> �. under a qualified hazardous materials expert in <br /> accordance with applicable regulations and <br /> d requirements from the Ccntral Valley RWQCB or <br /> the California Department of Toxic Substances. <br /> 3 This includes the December 4, 2003 crude oil <br /> releases and any migration of it to the project site. <br /> The soil underlying these facilities shall be <br /> sampled and tested by the experts.If the testing <br /> reveals contamination,the regulatory agencies <br /> o shall be contacted, any recommendations by the <br /> experts shall be implemented,and regulating <br /> agency shall identify"no further action"before <br /> project construction. <br /> o < Other potential existing sources of contamination <br /> (i.e.,septic systems,refuse piles,waste ponds, <br /> CD electrical transformers containing PCBs)on the <br /> project site and off-site infrastructure sites shall be <br /> identified and removed under the supervision of <br /> qualified hazardous materials experts and in <br /> o accordance with applicable regulations before <br /> construction.The applicant shall demonstrate to <br /> the County Environmental Health Department that <br /> o the above has taken place before issuance of <br /> building permits. If the experts observe potential <br /> o C/) soil contamination or noxious odors associated <br /> with these facilities,the soils underlying these <br /> �. facilities shall be sampled and tested by the <br /> n experts. If the testing reveals contamination,the <br /> regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be <br /> implemented,and the County Environmental <br />