Laserfiche WebLink
Km <br /> � 0 <br /> p' D <br /> College Park at Mountain House Specific Plan IH <br /> Mitigation Monitoring and Reporting Program <br /> mplementation Implementation &Verification <br /> 6 Mitigation Measure Timing Schedule Responsibility Action Date <br /> <n Completed <br /> n ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> m uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> v methodologies that may become available to <br /> a <br /> estimate the risk. The developers shall implement <br /> Bany project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> nwi The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> UD 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> c; the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> v are already included in the proposed project design <br /> = and/or are already required by the MHMP and by <br /> C0 0 mitigation in the MIIIvfP and Delta College EMs. <br /> � m <br /> o` Co <br /> a 2 <br /> c. <br /> oW <br /> c W <br /> 1 <br />