Laserfiche WebLink
= o <br /> n D <br /> oZE <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> M. Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> a biologist and DFG determine it would not be <br /> likely to adversely affect the nesting pair.DFG <br /> o shall also be consulted to determine if it is <br /> 3. necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> 0 nest is nu lullgvl dive. <br /> < If feasible,250-foot buffer areas shall also be <br /> established around all other occupied burrows. If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary. Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> alternative burrows outside the impact area,or <br /> capture and movement of owls to specific <br /> mitigation sites. <br /> o Other Nesting Raptors Before construction SJCOG,in <br /> CD <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting season(February 15 to August 31),pre- conducted 2 weeks <br /> construction surveys shall be conducted by a prior to construction <br /> d qualified biologist in areas of suitable nesting activities) <br /> o habitat within 500 feet of project activity. Surveys <br /> shall be conducted within 2 weeks before the <br /> R beginning of construction or tree removal.If no <br /> active nests are found,no further mitigation shall <br /> N 0 be required. <br /> < If active nests are found,impacts shall be avoided <br /> 0v7 by establishment of appropriate buffers.No <br /> W '9 project activity shall commence within the buffer <br /> S 0 area until a qualified biologist confirms that the <br /> o v nest is no longer active.DFG guidelines <br /> > > recommend implementation of 500-foot buffers, <br /> but the size of the buffer may be adjusted if a <br />