Laserfiche WebLink
Ko <br /> � D <br /> oCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action DateCompleted <br /> d <br /> a ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> o uses shall coordinate with the SJVAPCD to <br /> �. assess situations in which toxic risk from diesel <br /> � <br /> particulate matter(PM)may occur and to review <br /> ulcwodoluy-ice nidi liwy ucwuic avHuaUlc iu <br /> estimate the risk.The developers shall implement <br /> 3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> nw The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> CD <br /> 4.12-5 Air Quality—Increased Long-Term Regional Before construction SJVAPCD, in <br /> CD <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> R. The College Park developers shall implement all of construction developer <br /> m the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> v are already included in the proposed project design <br /> = and/or are already required by the MHMP and by <br /> m <br /> N mitigation in the MHMP and Delta College EIRs. <br /> � m <br /> U) <br /> o a <br /> a m <br /> c, <br /> C7 � <br /> o m <br /> c � <br />