Laserfiche WebLink
Eo <br /> c' D <br /> o• College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Responsibility Action Dale <br /> Completed <br /> a operational standards shall be established to minimize <br /> noise generated by loading dock activities from <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses.Design and operational <br /> measures may include: <br /> v <br /> < Enclose outdoor noise-generating equipment <br /> and/or set back from the property line. <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources,including loading dock activity. <br /> < Enclose loading dock areas <br /> w < Limit loading dock activity,including delivery <br /> a truck arrivals and departures,to between 7:00 <br /> a.m.and 10:00 p.m at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> n within a distance of 1,000 feet.Activity at all <br /> other loading docks shall be limited to the hours <br /> between 5:00 a.m.and 10:00 p.m. <br /> Noise studies,including on-site sound level <br /> measurements,shall be conducted to ensure that these <br /> d thresholds are not exceeded.The noise studies shall <br /> be funded by the College Park developers and <br /> approved by SJCCDD before construction. <br /> _d Landscape Maintenance <br /> = The following measures shall apply <br /> to noise- <br /> U) H generating activities associated with landscaping and <br /> M m maintenance of school grounds,neighborhood parks, <br /> o` community,parks,and open space. <br /> < On-site landscape maintenance equipment shall <br /> be equipped with properly operating exhaust <br /> cmufflers and engine shrouds, in accordance with <br /> manufacturers' specifications.For maintenance <br /> areas located within 320 feet of noise-sensitive <br />