Laserfiche WebLink
M <br /> � 0 <br /> c D <br /> 0 College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation <br /> Implementation d Verification <br /> Responsibility Action DateCompleted <br /> d <br /> 4.14-2 Visual Quality—Alteration of a Scenic Vista from During and after MHCSD <br /> n <br /> Mountain House Parkway construction <br /> o The following measures shall be implemented by the <br /> College Park developers: <br /> < If the landscaping and edge treatments required <br /> o by'he MIMP and bIIiCSD Dcaigu Manual have <br /> d not been developed on the east side of Mountain <br /> 3 House Parkway fronting the Pombo property by <br /> Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> o vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> o west-facing pond berm shall be densely landscaped <br /> by the College Park developers.In addition,the berm <br /> CD shall be constructed by the College Park developers <br /> ausing contoured and rounded slopes to avoid angular <br /> m face slopes.This shall be done concurrent with <br /> development of the pond. <br /> 0 <br /> c <br /> T. <br /> 2 <br /> a N <br /> N <br /> L rn <br /> O <br /> a m <br /> c � <br /> -. 0 <br /> � O <br /> n <br /> o � <br /> c � <br />