My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011429
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2600 - Land Use Program
>
PA-0300368
>
SU0011429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:50:39 PM
Creation date
9/6/2019 10:19:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011429
PE
2611
FACILITY_NAME
PA-0300368
STREET_NUMBER
23577
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
Zip
95391-
APN
20908026
ENTERED_DATE
7/19/2017 12:00:00 AM
SITE_LOCATION
23577 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/17/2017 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\23577\PA-0300368\SU0011429\BOS OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
these structure(s)shall be Civic Italianate. The design plans for the Community <br /> Gateway Element and the Pylon Sign Structure improvements and any sign located <br /> therein shall be subject to approval by the MHCSD General Manager and shall be <br /> consistent with all Community Approvals including applicable provisions of the <br /> MHCSD Design Manual and any applicable Special Purpose Plan. Timing: Prior to <br /> first Final Map. <br /> If the Community Gateway Element and the MH Business Park Pylon Sign Structure <br /> are combined, the MHCSD shall, in order to facilitate said combining, grant an <br /> easement to Pegasus for construction and maintenance of MHCSD approved <br /> improvements, including landscaping, the pylon sign and any other structures on the <br /> property containing the Gateway Element and the Pylon Sign Structure. Conditions <br /> of the easement shall be subject to approval by the MHCSD General Manager, which <br /> conditions shall include but not be limited to a requirement that Pegasus construct <br /> and maintain at its own expense the property and all improvements thereon, <br /> including the pylon sign,to the satisfaction of the MHCSD and that any modification <br /> to the improvements, including the pylon sign are subject to review and approval by <br /> the MHCSD prior to such modification. Improvements constructed, modified, and <br /> maintained by Pegasus shall be owned by Pegasus, except that if Pegasus or any <br /> successor to Pegasus should abandon the easement, MHCSD shall then own the <br /> improvements on the property with no compensation due to Pegasus. The <br /> architectural style for the combined structure shall be Civic Italianate. <br /> L. The dominant sign at the top of the Pylon Sign Structure shall be the Mountain <br /> House Logo to represent the entire community identity. Pegasus symbol/sign may <br /> be incorporated within the tenant I.D.field of signs. Timing: Improvements Plans for <br /> the Community Gateway shall be approved by MHCSD prior to the approval of the <br /> project's Final Map. Completion time may be modified by the MHCSD General <br /> Manager to reflect construction, weather, budget, or other public interest <br /> contingencies. <br /> M. The Development and Landscaping and other improvements of the Community <br /> Gateway Element shall be installed concurrently with the development of any parcels <br /> adjacent to 1-205 Freeway, or bonded for at the discretion of MHCSD. Timing: <br /> Improvements Plans for the Community Gateway shall be approved by MHCSD prior <br /> to the approval of the project's Final Map. Completion time may be modified by the <br /> MHCSD General Manager to reflect construction, weather, budget, or other public <br /> interest contingencies. <br /> N. Landscaping of Community Entries and Arterial Intersections shall be installed <br /> concurrently with adjacent streets. Entries, including Portal Structure and signage, <br /> shall be designed consistent with all Community Approvals including applicable <br /> provisions of the MHCSD Design Manual, and shall be reviewed and approved by the <br /> MHCSD General Manager concurrently with the adjacent street Improvement Plans. <br /> Timing: Improvement Plans for entries and intersections shall be approved by <br /> MHCSD prior to the approval of the project's Final Map. <br /> O. The design of Landscape Edge Treatments at 1-205,west edge embankment of <br /> Mountain House Parkway from Spatafore Parkway to 1-205, and PG & E Right-of- <br /> Way improvements including paths, alignment, standards, signage, lighting, and <br /> landscaping shall comply with all Community Approvals including applicable <br /> provisions of the MHCSD Design Manual and MHCSD Standards. Timing: Design <br /> plans shall be reviewed and approved by MHCSD prior to approval of the first <br /> building permit. <br /> P. Construction of Landscape Edge Treatments at I-205, west edge embankment of <br /> Mountain House Parkway from Spatafore Parkway to 1-205, and PG & E Right-of- <br /> Way improvements shall be completed to correspond with the development of <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.