My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009106
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
19258
>
2600 - Land Use Program
>
PA-1200034
>
SU0009106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:51 AM
Creation date
9/6/2019 10:24:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009106
PE
2625
FACILITY_NAME
PA-1200034
STREET_NUMBER
19258
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
LOCKEFORD
APN
01906003
ENTERED_DATE
3/19/2012 12:00:00 AM
SITE_LOCATION
19258 N JACK TONE RD
RECEIVED_DATE
3/16/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\19258\PA-1200034\SU0009106\APPL.PDF \MIGRATIONS\J\JACK TONE\19258\PA-1200034\SU0009106\CDD OK.PDF \MIGRATIONS\J\JACK TONE\19258\PA-1200034\SU0009106\EH COND.PDF \MIGRATIONS\J\JACK TONE\19258\PA-1200034\SU0009106\REV SITE PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1200034 <br /> Lockeford Community Services District <br /> Use Permit Application No. PA-1200034 was approved by the San Joaquin County Planning <br /> Commission on July 19, 2012. The effective date of approval is July 29, 2012. This approval will <br /> expire on January 28, 2014, which is 18 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2) all necessary building permits have been <br /> secured and remain in force, and (3) all necessary permits from other agencies have been secured <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, 209-468-8477) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details including gates, on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b) APPROVED USE: This approval is for a community center and public park to be built in two phases <br /> over a ten year period as shown on the Site Plan dated June 14, 2012. Phase One, building permits <br /> to be issued within 18 months from the effective date of approval, includes the construction of a <br /> 3,400 square foot community center for a maximum of 148 people. Phase Two, building permits to <br /> be issued within ten years from the effective date of approval, includes a 1.64-acre public park. (Use <br /> Type: Community Assembly and Recreation-Parks) <br /> c) LOT LINE ADJUSTMENT: Prior to the issuance of a building permit, a new deed reflecting the <br /> proposed adjustment of property lines must be recorded. <br /> d) CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital <br /> Facility Fee is applicable, the County shall collect the fees before the issuance of any building <br /> permits. (Development Title Section 9-1245.2) <br /> e) PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete to provide a <br /> durable, dust free surface. Bumper guards shall be provided when necessary to protect <br /> adjacent structures or properties (Development Title Section 9-1015.5[e]). <br /> 2) A minimum of 51 parking spaces shall be provided, including three accessible spaces, for <br /> Phase One. A minimum of 15 additional parking spaces shall be provided for Phase Two. At <br /> full buildout, 66 parking spaces shall be provided, including 3 accessible spaces, one of <br /> which shall be van accessible. Accessible spaces shall be located as close as possible to <br /> the primary entrance (C.C.R., Title 24).(Community Assembly use type:.67 parking spaces are <br />
The URL can be used to link to this page
Your browser does not support the video tag.