Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> GX-90-4 <br /> PAGE TWO <br /> 3 . SOUTH SAN JOAQUIN IRRIGATION DISTRICT <br /> Conditions of Approval: <br /> a. If easements for District facilities do not exist, the <br /> developer shall grant easements of sufficient width for the <br /> existing pipeline (D.D. ) and open ditch (Lateral "T") . <br /> b. Submit the excavation plans to the District for review and <br /> approval. <br /> C. The excavation shall provide for a fifteen foot (151 ) access <br /> road adjacent to the existing District pipeline and open <br /> ditch. Side slopes of 3 : 1 shall start at the edge of the <br /> fifteen foot (151 ) access road. <br /> d. Excavation equipment shall not be permitted to cross existing <br /> pipelines. <br /> 4. PACIFIC GAS AND ELECTRIC COMPANY <br /> Conditions of Approval: <br /> a. Pacific Gas and Electric Company maintains overhead power <br /> facilities within the proposed excavation area. Cuts within <br /> fifteen feet (151 ) of a pole, and fill that would diminish <br /> existing ground clearance are not allowed. <br /> S. PLANNING DIVISION <br /> ORDINANCE REOUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements are not appealable. <br /> a. Performance Guarantee. To ensure that the excavation is <br /> completed in conformance with the approved permit, the <br /> operator shall secure a performance bond or other financial <br /> security sufficient to cover the cost of rehabilitation of <br /> the site for agricultural use. The form of the bond or other <br /> financial security shall be found acceptable by the County <br /> Counsel. <br />