My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012269
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
23737
>
2600 - Land Use Program
>
PA-1900069
>
SU0012269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:42 AM
Creation date
9/6/2019 10:25:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012269
PE
2631
FACILITY_NAME
PA-1900069
STREET_NUMBER
23737
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366-
APN
22817026
ENTERED_DATE
4/9/2019 12:00:00 AM
SITE_LOCATION
23737 S JACK TONE RD
RECEIVED_DATE
5/6/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\23737\PA-1900069\SU0012269\APPL.PDF \MIGRATIONS\J\JACK TONE\23737\PA-1900069\SU0012269\CDD OK.PDF \MIGRATIONS\J\JACK TONE\23737\PA-1900069\SU0012269\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG, Inc. <br />S JC0G,Inc. <br />San Joaquin County Multi -Species Habitat Conservation & Open Space Plan <br />555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br />SJMSCP HOLD <br />TO: Local Jurisdiction: Community Development Department, Planning Department, Building <br />Department Engineering Department Survey Department Transportation Department, <br />Other: <br />FROM: Laurel Boyd, SJCOG, Inc. <br />DO NOT AUTHORIZE SITE DISTURSANC <br />DO NOT ISSUIE A BUILDING PERMIT <br />DO NOT ISSUE FOR THIS PROJECT <br />The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br />Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement, the <br />Applicant has agreed to: <br />1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br />1. Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br />project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs. <br />If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage. Upon receipt <br />of signed ITMMs from project applicant, SJCOG, Inc. staff will sign the ITMMs. This is the effective date <br />of the ITMMs. <br />2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />3. Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br />being covered (the bond should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />c. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />d. Purchase approved mitigation bank credits. <br />4. Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br />first, the project applicant must: <br />a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br />b. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />c. Purchase approved mitigation bank credits. <br />Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br />Project Title: PA -1900069 (SA) <br />Landowner: William and Elisabeth Van Klaveren Applicant: Precision SD <br />Assessor Parcel #s: 228-170-26 <br />T , R , Section(s): <br />Local Jurisdiction Contact: Giuseppe Sanfilippo <br />The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br />Incidental Take Minimization Measures are properly implemented and monitored and that <br />appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.