Laserfiche WebLink
v <br /> ADDITIONAL QUESTIONS III <br /> CHINCHIOLO FRUIT COMPANY AND SIERRA HILLS PACKING <br /> STOCKTON,SAN JOAQUIN COUNTY <br /> (i) A monthly water balance using a rainfall return period of 100 years distributed monthly <br /> in accordance with historic patterns. <br /> (ii) An annual nitrogen balance <br /> The plan must demonstrate that wastewater application at the design flow can be accomplished in <br /> accordance with accepted irrigation practices, and without contributing additional nitrogen to ground <br /> water. The plan must include contingencies for wastewater disposal for periods when the <br /> application area is saturated (i.e., during rainfall events) and for supplemental water if the <br /> wastewater is insufficient for irrigation. The plan must also describe methods to prevent runoff of <br /> tail water into streams, drainage courses, and/or onto properties owned by others, and to prevent the <br /> occurrence of nuisance vectors and odors. <br /> 13. Solids Handling. Describe all solid wastes generated at the facility and discuss how they are handled <br /> and disposed of. Volumes, chemical and physical characteristics, and final disposition of each waste <br /> stream (e.g., composting, land application, landfilling)needs to be described. If solid wastes are <br /> treated or disposed of on-site, a waste management plan for those wastes needs to be included. <br /> 14. Contact Information. Provide the name, address, and phone number of the person(s) responsible for <br /> operating and maintaining the production facility and wastewater application area. <br /> 15. CEOA Documentation. Before the Board can adopt WDRs for this discharge, the requirements of <br /> the California Environmental Quality Act (CEQA) must be complied with. Provide the County <br /> CEQA document for this facility. <br /> C Tmj=N=Sita\ChmO b Fmitkhbchiob050102A 20 September 2002 <br />