Laserfiche WebLink
L.1 March 8, 2005 <br /> NOA PROJECT NUMBER E04070B <br /> F11 hours from the hour meter, subtracting this measurement from the previous <br /> reading; then multiplying by 1800 gallons per minute* (gpm). <br /> F18.11.8 Supplemental Irrigation Hour Meter <br /> Data will be recorded in hours from the gauge on the diesel powered engine <br /> F1 driving a turbine pump. If necessary, gallons per minute (gpm) flows can be <br /> derived from a formula.located in the report from Neil.O. Anderson and <br /> Associates, Inc., titled"Technical Report-Meter Installation, Morada Produce <br /> Company, Waste Discharge Requirements" dated January 20, 2005. <br /> F18.12 Maintenance <br /> Gauges and meters should be recalibrated before each processing season in accordance with all <br /> operating and instruction manuals. <br /> Fil <br /> 8.13 Land Application Flowchart <br /> F1Morada Produce Facility (MPF)wishes to land-apply wastewater. <br /> Fj 1. Is it raining? <br /> l Yes: Do not land-apply. <br /> No: Proceed to 2. <br /> 4 <br /> 2. Is the land application area saturated? <br /> Yes: Do not land-apply <br /> No: Proceed to 3. <br /> 3 ► 3 <br /> 3. Has it rained in the last 24 hours? <br />' Yes: Do not land-apply <br /> No: Proceed to 4. <br /> F14. Has the orchard been irrigated in the last 24 hours? <br /> Yes: Do not land-apply <br /> No: Proceed to 5. <br /> i <br /> E 5. Is rain anticipated in the next 24 hours? <br /> Yes: Do not land-apply <br /> F, No: Proceed to 6. <br /> 6. Inspect the land application area. The area should be bermed or graded to prevent ponding, <br /> jF1 and a 50-foot buffer zone should exist between the area and any residential properties. Is erosion <br /> or potential for runoff evident? <br /> Yes: Repair berms as necessary. Proceed to 7. <br /> F] No: Proceed to 7. <br /> * The manufacturer states that the diesel powered turbine pump will produce 1800 gallons per <br /> F1 minute. <br /> 9 <br />