Laserfiche WebLink
F <br /> MONITORING AND REPORTING PROGRAM NO.R5-2003-017$ -3- <br /> MORADA PRODUCE COMPANY <br /> LINDEN PACKING SHED <br /> F, SAN JOAQUIN COUNTY <br /> Sampling Reporting <br /> { Constituents Units Type of Sample Frequency Frequency <br /> Mix Ratio 3 Calculated Daily Monthly <br /> BODS Loading Rate lbs/'acre-day Calculated' Monthly Monthly <br /> �( Total Nitrogen Loading Rate lbs/acre-month Calculateda Monthly Monthly <br /> Cumulative Nitrogen lbs/acre-year Calculated Monthly__ <br /> Loading Rate <br /> Total Dissolved Solids <br /> Loading Rate lbs/acre-year Calculated Monthly Monthly <br /> .Runoff Visual Inspection Observation Daily, Monthly <br /> 1 BODS loading shall be calculated using the daily applied volume of wastewater,estimated daily application area,and <br /> the most recent results of effluent BODS. <br /> Wastewater Loading Rate and Supplemental Irrigation shall also be reported in gallons. <br /> a Mix ratio is the ratio Supplemental Irrigation divided by Wastewater Loading Rate. <br /> 4 Total nitrogen loading rates shall be calculated using the daily applied volume of wastewater,estimated daily <br /> application area,and the most recent results of total nitrogen(sum of Nitrate as Nitrogen and Total Kj eldahl Nitrogen). <br /> Runoff monitoring shall be performed when irrigation of the areas occurs. Frequency of monitoring during the day <br /> shall be sufficient to determine if runoff is occurring. <br /> In addition, the Discharger shall maintain a log of discharges to the land application area. Observations <br /> shall be noted and shall record which check is receiving wastewater, observations of ponding water, soil <br /> i clogging, odors, insects, or other potential nuisance conditions. The notations shall also document any <br /> corrective actions taken. A copy of the notations recorded each month shall be submitted along with <br /> monthly monitoring reports. <br /> GROUNDWATER MONITORING <br /> F." <br /> The following monitoring requirement is only necessary if the Discharger installs groundwater <br /> monitoring wells as a result of the Effluent Evaluation. If wells are installed, then this program shall be <br /> effective beginning with the second quarter of 2004. If the Discharger elects to install lysimeters instead <br /> of groundwater monitoring wells, then this same program is in effect,with the exception of the first four <br /> items in the table below. If lysimeters are installed,then this program is also effective beginning with <br /> the second quarter of 2004. <br /> Prior to construction and/or sampling of any groundwater monitoring wells, the Discharger shall submit <br /> k plans and specifications to the Regional Board for review and approval. Once installed, all new wells <br /> shall be added to the MRP and shall be sampled and analyzed according to the schedule below. <br /> Prior to sampling, the groundwater elevations shall be measured and the wells shall be purged at least <br /> three well volumes until temperature,pH and electrical conductivity have stabilized. Depth to <br /> groundwater shall be measured to the nearest 0.01 feet. Samples shall be collected using standard EPA <br /> methods. Groundwater monitoring shall include, at a minimum, the following: <br /> F <br /> 3 <br />