My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004406
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
500
>
2600 - Land Use Program
>
SA-01-64
>
SU0004406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:46 AM
Creation date
9/6/2019 10:26:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004406
PE
2632
FACILITY_NAME
SA-01-64
STREET_NUMBER
500
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
LINDEN
APN
10504015
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
500 N JACK TONE RD
RECEIVED_DATE
8/23/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\500\SA-01-64\SU0004406\APPL.PDF \MIGRATIONS\J\JACK TONE\500\SA-01-64\SU0004406\CDD OK.PDF \MIGRATIONS\J\JACK TONE\500\SA-01-64\SU0004406\EH COND.PDF \MIGRATIONS\J\JACK TONE\500\SA-01-64\SU0004406\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 1 <br /> I "` r <br /> ructure# Proposed use Ground Floor Highest Floor Overall Height <br /> i <br /> 101 Existing Packing Shed 13,600 0 22' <br /> 102 Existing Canopy 5,100 0 18' <br /> 103 Proposed Onion Packing Shed 25,500 0 25' <br /> 104 Proposed As aragus Packing Shed 20,000 0 28' <br /> 105 Proposed Pallitizing/Cold Room 8,700 0 25' <br /> 106 Proposed Mechanical room 770 0 20' <br /> 107 Proposed Electrical room 825 0 20' <br /> 108 Proposed Restroom 637 0 12' <br /> 109 Proposed 2 story office 2,025/story 12 25' <br /> 110 Proposed Cherry packing shed 20,000 0 25' <br /> Proposed Parking <br /> Since different parts of the building facility are used during each produce season, <br /> the 1 per 1000 would not be a reasonable requirement for parking, <br /> Therefore we have calculated a total of 60 parking spaces based upon <br /> 2 for every 3 employees during the largest shift of the highest employee <br /> required process (cherries). 213 of 60=40 spaces+ 50% for any overlap and <br /> M growth. <br /> f <br /> E <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.