My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003152
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
8000
>
2600 - Land Use Program
>
SA-92-40
>
SU0003152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 8:28:07 AM
Creation date
9/6/2019 10:27:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003152
PE
2633
FACILITY_NAME
SA-92-40
STREET_NUMBER
8000
Direction
S
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
8000 S JACK TONE RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\8000\SA-92-40\SU0003152\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> FOR REVISIONS OF APPROVED ACTIONS <br /> SA-9240 <br /> Tri-Ag Service <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Chandler Martin, 468-3190) <br /> a. APPROVED USE: This approval is for a Revisions of Approved Actions Application as <br /> shown on the Plan submitted July 26, 1996. The approved use is for an agricultural <br /> fertilizer application service and the retail sales of agricultural fertilizers and agricultural <br /> chemicals (use types: Farm Services, and Agricultural Sales). All previously approved <br /> Conditions of Approval continue to apply. In addition,the following conditions of Approval <br /> apply: <br /> b. PHASING: Construction of the project may be in phases, as follows: <br /> (1) Phase 1 shall be completed prior to March 26, 1997. Phase 1 shall include the <br /> following: <br /> A. Provide a storm drainage pond and all on-site grading. <br /> B. Pave the first 75 feet of the driveway with a minimum of 2 inches of <br /> asphalt over a 4-inch road base. <br /> C. Pave the parking area and the driveway around the office. <br /> D. Install a 24-foot by 50-foot mobile office building. <br /> E. Construct a 20-foot by 60-foot shop. <br /> F. Construct a 12-foot by 60-foot NH3 tank. <br /> G. Construct a 55-foot by 100-foot liquid fertilizer area. <br /> H. Construct a 20-foot by 60-foot flammable liquid area. <br /> I. Construct a 30-foot by 75-foot wash area. <br /> J. Install aggregate road base on the entire site, except the equipment <br /> storage area. <br /> K. Double chip seal the remaining driveway and circulation area. <br /> (2) Phase 2 shall be completed prior to March 26, 2000. Phase 2 shall include the <br /> following: <br /> A. Construct a 50-foot by 100-foot warehouse. <br /> B. Install a scale. <br /> Conditions of Approval - 1 - SA-9240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.