Laserfiche WebLink
PROJECT DESCRIPTION <br /> Project: <br /> Title: PROPOSED IRRIGATION PIPELINE FACILITY_ <br /> Owner:_PACIFIC SOUTHWEST IRRIGATION CORP._(PROPOSED) <br /> Jobsite:_8372 S.JACK TONE RD.,STOCKTON,CA 95215 <br /> Assessor's Parcel Number:_183-080-05 <br /> Jurisdiction:_SAN JOAQUIN COUNTY <br /> THE PROPOSED PROJECT,IRRIGATION PIPELINE FACILITY, IS LOCATED ON 8372 SOUTH <br /> JACK TONE RD., STOCKTON,CALIFORNIA,APN#183-080-05, 11.99 ACRES. THE CURRENT <br /> ZONING IS AG40 AND IS CURRENTLY UNDER THE WILLIAMSON ACT. THE PARCEL IS <br /> LOCATED IN THE COLLEGEVILLE FIRE DISTRICT AND WITHIN THE ESCALON UNIFIED <br /> SCHOOL DISTRICT. <br /> THE PROPOSED OWNER IS TO BE PACIFIC SOUTHWEST IRRIGATION CORP. THIS FIRM <br /> DEALS WITH THE DESIGN AND INSTALLATION OF IRRIGATION PIPELINE FOR FARM LAND. <br /> THEY ARE PRESENTLY LOCATED AT 13771 S.PRESCOTT RD.,MANTECA,CA 95336. <br /> THE EXISTING SITE IS CURRENTLY VACANT FARMLAND. THE SITE IS CURRENTLY IN <br /> FLOOD ZONE C, PANEL 060299 0470 A,DATED 5/15/80. ON THE NORTHERN BORDER IS THE <br /> B.N.&S.F. RAILROAD. TO THE SOUTH IS LITTLE JOHNS CREEK. IN ADDITION, A COUNTY <br /> OVERPASS IS LOCATED ACROSS THE WESTERN PORTION OF THE PROPERTY. PLEASE <br /> NOTE THE FOLLOWING; <br /> A) REFER TO APPENDIX"A"FOR A COPY OF MR.WES JOHNSON'S 09/09/04 FAX OF <br /> THE FEE AREA ACQUIRED FROM BRITZ FERTILIZERS,INC. SIGNED BY MR.JEFF D. <br /> LUND,SAN JOAQUIN COUNTY'S ASSISTANT SURVEYOR. <br /> B) REFER TO APPENDIX "B" FOR THE PROJECTS INGRESS / EGRESS / UTILITY <br /> EASEMENT FROM S. ACCESS ROAD IN COMPLIANCE WITH MR. WES JOHNSOMS <br /> 09/01/04 TRANSMITTAL OF EASEMENTS DRAFT SIGNED BY MR. JEFF D. LUND, SAN <br /> JOAQUIN COUNTY'S ASSISTANT SURVEYOR. <br /> THE NEW SITE WILL BE ADDRESSING THE FOLLOWING,PLEASE REFER TO THE SITE PLAN <br /> FOR ADDITIONAL DETAIL; <br /> 1) 7000 SQ FT WAREHOUSE. ALL WAREHOUSE,NO RETAIL. <br /> 2) 2000 SQ FT OFFICE. <br /> 3) 1800 SQ FT SHOP FOR LIGHT FABRICATION AND WELDING OF PIPE. <br /> 4) 15 ONSITE EMPLOYEES,ONE SHIFT,MONDAY THRU SATURDAY,6AM TO 6PM. <br /> 5) 5 TRUCKS PER DAY FOR DELIVERY. <br /> 6) 3 TRUCKS PER DAY FOR EXPORT. <br /> 7) ALL TRUCKS ARE BOB-TAILS. <br /> 8) THERE ARE(4)SERVICE TRUCKS. <br /> 9) THE YARD WILL BE UTILIZED FOR PIPE STORAGE. <br /> 10) 1 CUSTOMER PER SHIFT. <br /> PROJECTED PHASES OF CONSTRUCTION ARE AS FOLLOWS; <br /> PHASE 1; STORAGE YARD USAGE 11/2004 <br /> PHASE ll; MOBILE OFFICE FACILITY W/SITE IMPROVEMENTS 1/2005 <br /> PHASE III; SHOP/WAREHOUSE STRUCTURE 5/2005 <br />