Laserfiche WebLink
"..­] 771 "`71 771 7771 7-7..1 .tel 7"77 7_7_1 <br /> HEAD LOSS DUE TO PIPE FRICTION DATE: <br /> PROJECT <br /> PIPE SIZE (inches): '"0 RAW PIPE SIZE (inches): <br /> -------------------------------------- ------------------------------------ <br /> LENGTH-OF PIPE- „ <br /> LENGTH OF PIPE (ft): '_'"'.:20;x. _ { ) <br /> -------------------------------------- --------------------- <br /> FLOW m fit}... FLOW(gPm) e <br /> ---------------- <br /> Ch= 100 TYPE OF PIPE DIP,PVC): :, <br /> TYPE OF PIPE (DIP,PVC): . qI®i'__ ( i Ch= 13 <br /> FRICTION HEAD LOSS 1.97ft FRICTION HEAD LOSS 7.1 Oft <br /> VELOCITY 5.104 VELOCITY 5,104 <br /> STATIC HEAD <br /> MINOR HEAD LOSSES <br /> Formula's <br /> FITTING Material # USED Le Material I # USED Le <br /> GATE 1 PLUG VALVE (open) DIP 2.00 PVC hl=L* (Q11.32*A*Ch*R"0.63)^1.852 <br /> BALL VALVE (open) DIP PVC _. ._._,.-- <br /> �.B <br /> SWING 1 CHECK VALVE (open) DIP =�.. 22.50 PVC Le= K* D 1 Ft <br /> BUTTERFLY VALVE (open) DIP <br /> PVC <br /> GLOBE VALVE (open) DIP PVCA= Pi * D^214 <br /> ANGLE VALVE (open) DIP 1PVC <br /> 90 deg. ELBOW (STANDARD) DIP 2 - 10.00 PVCp; -.._...� <br /> 90 deg. ELBOW(LONG) DIP <br /> -......... - PVC ... <br /> 45 deg. ELBOW DIP - 5.33 PVC 1 .�.. .' 5.33 <br /> STANDARD TEE (RUN) DIP 1 1 a� 4.17 PVC <br /> STANDARD TEE (BRANCH) DIP 10.83 PVC ' s <br /> OTHER KNOWN LOSSES DIP m <br /> PVC <br /> a <br /> EQUIVALENT LENGTH 54.83 5.33 <br /> HEAD LOSS 5.73ft <br /> TOTAL DYNAMIC HEAD 26.81ft <br />