My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002249 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2600 - Land Use Program
>
UP-98-08
>
SU0002249 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/6/2019 10:28:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002249
PE
2626
FACILITY_NAME
UP-98-08
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
APN
01115012
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\SS STDY.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\NL STDY.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A maintenance program should be established for the entire wastewater disposal system. Predicting <br /> septic tank pump-out intervals is impossible because it is unknown as to the number of on-site people <br /> at any given time,and the composition of influent throughout the year. <br /> The second maintenance issue will be the washing"off the BioTube f Iters:periodically, preferably at <br /> tank,pump-out. A waterline with a hose.bibb should be installed, or made available near the pump <br /> chamber tank for BioTube filter maintenance. <br /> Clean-outs will be installed at the distal ends of each lateral through what is referred to as."turn-ups" <br /> or"sweeps" as.noted. on the plan schematics. By using along"battle-brush" or small diameter <br /> "Snake7 arrangement,the interiors of the laterals can be cleaned of biological scum/slime build-up. <br /> This maintenance procedure should be done on an experimental basis, for example, initially on a <br /> monthly interval to observe if there is scum/slime build-up within the laterals. <br /> Water softeners should not be.installed because the sodium from water softeners will bind the clay <br /> fraction of the soil and impede permeability. Although this phenomenon-is debated in the scientific <br /> literature, it is a distinct possibility and should be avoided since it could lead"to a decrease in <br /> disposal area longevity.-. <br /> Accurate."as-bui"lts".of the domestic wastewater management system.installed must be supplied to <br /> { the Environmental Health Department. All applicable "distance" and"setback"requirements must <br /> be strictly followed: <br /> It is imperative to recognize that all septic systems arid disposal"areas have a lifespan. This lifespan <br /> is unpredictable due to the numerous operational and environmental factors-involved. A critical <br /> lifespan issue is"controlling the on-site water use as much as possible. This may"be accomplished by <br /> _using low flow toilets and spring-loaded'sink faucets. 'Restricting water use also includes checking <br /> -for water leaks in toilets, dripping faucets, etc. on a"regular monthly`basis.. <br /> 22 <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.