Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200171 <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $164.60 per <br /> additional daily trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:sh <br />