My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004612 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JAHANT
>
9422
>
2600 - Land Use Program
>
PA-0400251
>
SU0004612 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:58 AM
Creation date
9/6/2019 10:32:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004612
PE
2611
FACILITY_NAME
PA-0400251
STREET_NUMBER
9422
Direction
E
STREET_NAME
JAHANT
STREET_TYPE
RD
City
ACAMPO
Zip
952209616
APN
00734009
ENTERED_DATE
8/23/2004 12:00:00 AM
SITE_LOCATION
9422 E JAHANT RD
RECEIVED_DATE
8/20/2004 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JAHANT\9422\PA-0400251\SU0004612\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LNovember 8, 2004 <br /> NOA Project Number: E0401 10A <br /> 4.0 PERCOLATION TEST INFORMATION <br /> LX61 Percolation Test Locations <br /> A site map indicating the locations of the percolation test holes is included as Plate 1 in the appendix <br /> Lof this report. <br /> A--6.2 Number of Percolation Tests <br /> LOne shallow and one deep percolation test were conducted on each proposed parcel of the Site, for <br /> a total of 12 shallow and 12 deep percolation tests. <br /> L6.3 Boring Preparation and Presaturation <br /> L A total of 12 shallow and 12 deep soil borings were advanced on the Site with a truck-mounted B53 <br /> augur rig on September 14, 15, and 16,2004. <br /> L A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br /> water in the percolation test boring. Approximately 2 inches of"pea gravel"were placed in the <br /> bottom of the open soil boring, then the PVC pipe was installed on top of the gravel. Several feet <br /> of"pea gravel' were backfilled in the annular space. <br /> Presaturation of the percolation test holes occurred on September 21 and 22,2004. The depth of <br /> water used to pre-soak was 12 inches above the bottom of the boring. <br /> X6.4 Condition of Borings After Presaturation <br /> LAfter the 24-hour soak period, the presaturated holes were found to be intact onSentember 22 and <br /> 23, 2004. The deep holes at P-2 and P-5 were found to bei on September 23, 2004. Both holes <br /> at P-7 and P-10, the deep holes at P-9 and P-12,and the shallow hole at P-11 were found to be dry <br /> / on September 22, 2004. Standing water was observed in the remaining holes. <br /> 6.5 Percolation Test Procedure <br /> LPercolation tests were conducted for the borings on September 22 and 23,2004 in accordance with <br /> the requirements of the EHD. A percolation test with a duration of four hours was performed for <br /> each hole. The final half-hour of each four-hour percolation test was observed by Ms.Lisa Medina, <br /> Senior Registered Environmental Health Inspector,EHD. <br /> L <br /> L <br /> �. g <br /> .,A4L <br />
The URL can be used to link to this page
Your browser does not support the video tag.