Laserfiche WebLink
Chapter 1 <br /> Introduction <br /> 1.1 Project Overview <br /> This Initial Study/Mitigated Negative Declaration(IS f MND)evaluates the proposed amendments to <br /> the San Joaquin County General Plan,Mountain House Master Plan(Master Plan),Specific Flan I]and <br /> Rezoning(these amendments are referred to,collectively,as the project).Specifically,the project <br /> includes amendments to Neighborhoods H.I,J.Land the Town Center in the Mountain House <br /> development.This chapter explains the project overview,provides the purpose of the 1S fMNDr <br /> establishes the context and scope of the[S/MND,provides references to relevant previous <br /> environmental review documents and reports,and provides a summary of project information.San <br /> Joaquin County is the lead agency for the project for purposes of environmental review under the <br /> California Environmental Quality Act(CEQA).Lead agency is defined by CEQA Guidelines Section <br /> 21057 as"the public agency which has the principal responsibility for carrying out or approving a <br /> project which may have a significant effect upon the environment." <br /> 1.2 Purpose of this Initial Study//Mitigated Negative <br /> Declaration <br /> The 1994 Master Plan was the subject of the certified 1944 Mauntain House Master P?an Final EfR <br /> (1444 MEIIR).Public Resources Cade(PRC)section 21166 provides: <br /> When an environmental impact report has been prepared for a project pursuant to this <br /> division,no subsequent or supplemental environmental impact report shall be required <br /> by the lead agency or by any responsible agency,unless one or more of the following <br /> events occurs: <br /> (a)Substantial changes are proposed in the projectwhich will require major revisions of <br /> the environmental impact report. <br /> (h)Substantial changes occur with respect to the circumstances under which the project <br /> is being undertaken which will require major revisions in the environmental impact <br /> report. <br /> (cj New information,which was not known and could not have been known at the time <br /> the environmental impact report was certifie d as complete,becomes available. <br /> If impacts resulting from changes to a project do not differ significantly from those analyzed in the <br /> previously certified E[R,a further E[R is not required. <br /> This IS f MND identifies the potential environmental effects resulting from the project and includes <br /> updated analyses,particularly for the resource categories of air quality,energy,greenhouse gas <br /> emissions,noise,transportation,tribal cultural resources,and wildfire.While the adaption of new <br /> regulations or issuance of new guidelines does not constitute new information within the meaning <br /> of PRC 21166(c)if the information about the underlying resource and potential project impact was <br /> Mountain iiause master Plan and speer Plan a Pu6April 2o22 <br /> fic Draft <br /> Amendments and Reuisiotra to approved actions rcF IU41B0 <br /> initial studg/m itig3ted Negatioe Declaration 1-1 <br /> 154328501.1 <br /> Resolution Template 01/2017 <br />