San Joaquin County Projed Desuip[ion <br /> include Saturdays and Sundays may be allowed through notice to adjacent residents and <br /> landowners,and prior approval of the Mountain House Community Services district for <br /> infrastructure construction.The first phase of Central Community Parkin the Town Center(grading <br /> and site improvements)is expected to begin in Spring of 2D22 and be completed within 18 months. <br /> Neighborhood 1 construction phase(grading and site improvements)is expected to begin in Spring <br /> 2422 and be completed within 18 months.Neighborhood 1 construction start phase(grading and <br /> site improvements)is expected to begin in the Spring of 2026 and be completed within Ill months. <br /> Neighborhood L construction phase C rading and site improvements]is expected to begin in Spring <br /> 2029 and be completed within IS months. <br /> Table 1-1.Project Phasing <br /> Neighborhood Start Completion <br /> Town Center Spring 2022 Winter 2024 <br /> Neighborhood H Spring 2024 Fall 2026 <br /> Neighborhood 1 Spring 2D22 Fall 2024 <br /> Neighborhood K Fall 2024 Fall 2025 <br /> Neighborhood l Spring 2026 Fall 2027 <br /> Neighborhood L Spring 2029 Fall 2030 <br /> Source:Mountain House DeveEopers.LLC.2021. <br /> 2.4.7.2 Construction Equipmentand Staging <br /> Typical equipment would be used during project construction,including dozers,leaders,duntp <br /> trucks,excavators,and backhoes.Pile driving is anticipated.Potential construction laydown and <br /> staging areas would be onsite in undeveloped areas or nearby depending on site acreage and <br /> availability of vacant sites. <br /> 2.4.7.3 Construction 'Employment <br /> The size of the construction work#'nrce would vary during the different phases of construction of <br /> each neighborhood and the Town Center.On average,approximately 150 workers would be at the <br /> project site per day during peak construction activity. <br /> 2.4.7.4 Construction Grading <br /> Approximately 85%of the project's development area has been mass graded or otherwise disturbed <br /> pursuant to prior approvals.A significant amount afgrading was previously completed in 2007 <br /> within neighborhoods I and 1 to establish rough grade elevations for the project and to create the <br /> storm water quality ponds.The project would require soil to be excavated;no structures would be <br /> demolished during site preparation.The project is expected to have an overall balance of sail,s o <br /> there should be no export or import of soil into or out of Mountain House The project site does not <br /> include any existing structures.so there would be no demolition. <br /> 2.5 Project Approvals <br /> The following county discretionary approvals would be required prior to development. <br /> Mountain House Master Nan and Spenfic Wan-I public Draft April 2422 <br /> Amendments and Revisions to approved anions ICF IMBU <br /> Initial Stu WIMintated Negative Declarmt on 2-10 <br /> 3x43285101.1 <br /> Resolution Template 01/2017 <br />