Laserfiche WebLink
e <br /> y <br /> R(,x13!!v <br /> ca " P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> ,�. :4 THOMAS M.GAIL <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> • (209)468-3000 FAX(209)468-2999 <br /> www.sjgoy.org/pubworks <br /> MICHAEL SELLING �� ��� <br /> DEPUTY DIRECTOR RECEIVED <br />' STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> JUN (➢ n i <br /> ROGERJANES e7 U f <br /> BUSINESS ADMINISTRATOR Community Development Dept. <br /> r <br /> i June 29,2011 r <br /> MEMORANDUM <br /> TO: John Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Corinne King <br /> FROM: Alex Chetley,Engineer V <br /> Public Services Division/ <br /> SUBJECT: PA-1100093;A Site Approval application for a 140-foot-high lattice tower for Mountain House <br /> G Community Services District emergency services; located on the northerly side of Byron Road <br /> I approximately 600 feet northwesterly of Kelso Road in the community of Mountain House. <br /> (Supervisorial District 5) <br /> PROPERTY OWNER: Mountain) House Community Services District APPLICANT: Tesla Towers <br /> ADDRESS: 18045 S. Kelso Road, Tracy APN: 258-020-29 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Byron Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> Kelso Road has an existing right-of-way width of 66 feet and a planned right-of-way width of the same. <br /> i <br /> RECOMMENDATIONS: <br /> 1' <br /> I. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> �i (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan.shall be submitted prior to release of building permit. <br /> i <br />