Wetlands <br /> No structures will be located within 50 feet of the wetlands located on the northwest side <br /> of the plant. The backwash ponds and drying beds have been located between the <br /> structures and the wetlands to provide additional buffering. If surplus reclaimed <br /> backwash water is available, it may be desirable to discharge this water, which is free <br /> from pollutants, to the wetlands. <br /> Operation and Maintenance <br /> During the first few years, water demands will be low and it will be necessary to only <br /> operate the treatment facilities up to 8 hours per day during a day shift using one <br /> operator. <br /> Ultimately, it is assumed one operator will be on a "fireman" shift and be at the plant for <br /> a 24-hour shift during which he works 8 hours, is on call 8 hours, and sleeps 8 hours. <br /> During the day shift, up to four other operation and maintenance personnel would be at <br /> the plant. <br /> Schedule <br /> It is anticipated that the design of the initial treatment system will be completed in early <br /> 1998, with construction to begin immediately. Completion is projected for January, <br /> 1999. <br /> -4- <br />