Laserfiche WebLink
I <br /> Kerry Sullivan -?- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200012 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fce currently is $164.60 per <br /> 1000 square feet in the Lodi area. The fee shall be automatically adjusted July 1. of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. A credit may be allowed if it can be verified that the existing development on this <br /> site was in operation on or after April 23, 1990.) <br /> x (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> S. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> GK:BN:ap <br /> P:�convnen is�SA�PA-02-12 <br />