Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-0200012 (SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The lee is due <br /> and payable at the time of building permit application. ("The fee currently is 5164.60 per <br /> 1000 square feet in the Lodi area. The fee shall be automatically adjusted July 1 Of each <br /> year by the Engineering Construction Cost Index as pubhshed by the Engineering News <br /> Record. A credit may be allowed if it can be verified that the existing development on this <br /> • site was in operation on or afler Aprzl 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Fina] Site flan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan format for Development <br /> Projects. Finai Site Plan is required upon submittal of verification_ <br /> GK:BN:ap <br /> n <br /> f <br /> I <br /> P:\c(iam nt,\SJ.\P;,-01-i2 <br />