Laserfiche WebLink
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> D_.eiiniSl�.�orttin a ed <br /> Regulated Asbestos-Containing (1) Friable asbestos-containing material(ACM). <br /> Materials fRACM)Include: (2) Category 1 nonfriable ACM in poor condition and"has become friable"or that has or <br /> will be subjected to sanding,grinding,cutting,or abrading. <br /> (3) Category It nonfriable ACM that has a high probability of becoming,or as become, <br /> crumbled,pulverized,or reduced to powder by the forces expected to act on the material <br /> in the course of demolition or renovation. <br /> Friable Asbestos-Containing Any material containing more than 1 percent asbestos,as determined by Polarized Light <br /> Malarial(ACM) Microscopy(PLM)testing,which,when dry,can be crumbled,pulverized,or reduced to <br /> powder by hand pressure. <br /> Category I nonfriable AGM: Any zsbastos-containing packings,gaske's,resilient floor coverings, and asphalt roofing <br /> products containing more than 1 percent asbestos as determined by PI-M testing. <br /> Category It nonfriable ACM. Any asbestos-containing materials, excluding Category 1 ACM,containing more than 1 <br /> percent asbestos as determined by PLM testing,which when dry,cannot be crumbled, <br /> pulverized,or reduced to powder by hand pressure. <br /> Inspection: done by, or under the direction of a Cal-OSHA certified consultant prior to: <br /> 0 Any regulated demolition. <br /> 0 Any renovation activity in which more than 160 sq.h.of any building material or 260 linear feet of pipe insulation will be disturbed. <br /> An inspection is not required if the materia3 to be disturbed is stipulated to be asbestos-containing and wiil be removed in <br /> " accordance with the NESHAP, <br /> lnspectiQn RC.pq .ust_lnclitd_e: <br /> 0 A schematic showing the location of all tested materials. <br /> 0 The following data for all asbestos-containing materials: <br /> 1.The amount and description of each material. <br /> 2. Percent asbestos content. <br /> 3.Whether or not the material is friable. <br /> Notificato n: An asbestos notification must be submitted to the District aSleast 10 working dans lior to: <br /> 1.Any regulated demolition. <br /> 2.Any renovation in which more than 160 sq, ft.or 260 linear ft.of RACM will be disturbed. <br /> A copy of the Asbestos Inspection Report must be included with the Notification. <br /> Notification will not be considered complete, nor wilt the 10 working day notice period begin until all required information and fees <br /> have been submitted to the District. <br /> E��s: District Ruie 3050 requires that nonrefundable asbestos fees be received along with asbestos job notifications. Fees must <br /> be paid for regulated asbestos abatement projects and regulated demolition projects,whether or not asbestos is ore.� ti <br /> Remolitio�Be.l1 a e .orm:The California Health and Safety Code requires that the city or county building official have proof of <br /> compliance with, or exemption from,the asbestos notification requirement before he or she issues a demolition permit. <br /> After the District has received a demolition notification and is satisfied that the NESHAP notification requirements have been <br /> complied with, the District will issue a Demolition Release Form to the person who submitted the notification. <br /> The asbestos notification must also identify any building materials which will be recycled after <br /> removal from a project. The name of the recycling contractor and location of such activity must be identified. <br /> r <br />