Laserfiche WebLink
YES NO <br /> Other sources used : <br /> 7 . Hazards : <br /> a . Will the project create a risk of <br /> explosion ; release, generate or <br /> store any hazardous substances ; or <br /> cause other dangers to public health <br /> and safety? <br /> b. Are there any known hazardous <br /> substances located within 500 feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> groundwater contamination) ? <br /> C. Will the project result in <br /> interference with , or need for , G <br /> emergency plans? <br /> Other sources used : <br /> 8 . Utilities and Public service : <br /> *} a . Will the project require alteration of , <br /> addition to, or the need for new utility <br /> systems (water , sewer , drainage , solid <br /> waste) , including a Sphere of Influence <br /> or district boundary change? <br /> Tx b. will the project result in the <br /> need for or the expansion of the <br /> following services : fire and police <br /> rotecti on , schools , parks and <br /> recreation , libraries , roads , flood <br /> control , solid waste or other public <br /> works facilities , public nransit, or <br /> ycvernnental services? <br /> Will the project adversely inpact <br /> existing recreational/part: <br /> opportunities or require new <br /> park/recreation opportunities? <br /> Note: ''Yes" answers to these two cues ions and 9 (b) below <br /> will require aiiiticnal discussion, but do not necessarily <br /> indicate a ao4entiaiiy significant impact. <br /> Initial Study (Rev: 0I/ 91) <br /> 5 <br />