My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003153
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KENNEFICK
>
27751
>
2600 - Land Use Program
>
SA-92-41
>
SU0003153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:42 AM
Creation date
9/6/2019 10:38:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003153
PE
2633
FACILITY_NAME
SA-92-41
STREET_NUMBER
27751
Direction
N
STREET_NAME
KENNEFICK
STREET_TYPE
RD
City
GALT
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
27751 N KENNEFICK RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KENNEFICK\27751\SA-92-41\SU0003153\APPL.PDF \MIGRATIONS\K\KENNEFICK\27751\SA-92-41\SU0003153\CDD OK.PDF \MIGRATIONS\K\KENNEFICK\27751\SA-92-41\SU0003153\EH COND.PDF \MIGRATIONS\K\KENNEFICK\27751\SA-92-41\SU0003153\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The 18± acres where Mr. Hardesty proposes to construct the ponds are <br /> nearly level and within the 100-year flood plain of Dry Creek. The total <br /> bottom area of two ponds will be 13.27 ± acres. This would leave 4.73 ± non- <br /> contiguous acres available for stock piling approximately 297,650 cubic yards <br /> of soil. If the soil was spread evenly, it would be 13 yards high on this <br /> remaining acreage. In addition, Public Works is expressly prohibiting the <br /> stock piling of excavated material within the 100-Year Flood Zone. (See <br /> Condition (b) of the Public Works Section in the Site Approval Conditions.) <br /> This could further reduce the amount of available acreage for stock piling. <br /> It is equally impossible to stock pile this amount of soil on the <br /> southern 32 acres of Mr. Hardesty's property. The construction of the ponds <br /> will not affect this portion of the property. Mr. Hardesty proposes to continue <br /> the current use of this portion for grazing. First, the topography of the parcel <br /> prohibits such stock piling. If 297,650 cubic yard of soil are stock piled on this <br /> portion of the property the amount of available grazing land will be reduced, <br /> by covering the existing grasses and topsoil. To stock pile this amount of soil <br /> would require Mr. Hardesty to build up this portion of the property by 12 to 14 <br /> feet. From the proposed pond site to this portion of the property there is <br /> already a rise of 10-12 feet. Whether Mr. Hardesty spread the soil evenly or <br /> stock piled it in one area, the effect would be to change the natural drainage <br /> system. This could cause a significant adverse impact to the drainage not only <br /> on Mr. Hardesty's property but on the neighboring properties. <br /> Stock piling the excavated soil anywhere on Mr. Hardesty's property <br /> will adversely affect the habitat value of the property for existing wildlife. <br /> Covering the existing plants and grasses on the southern portion of the <br /> property with this soil will decrease the amount of available cover, nesting <br /> and foraging potential for existing wildlife. There are also several oaks on <br /> the property. Increasing the soil within the drip lines of these oaks could <br /> result in their loss. Even if the drip line area is avoided, an increase of soil <br /> beyond the drip lines could result in the creation of basins in which water <br /> could collect around the base of the oaks. This would also result in the <br /> ultimate loss of the oaks. <br /> Numerous seasonal wetlands and vernal pools are scattered through <br /> the southern 32 acre portion of this site. . To stockpile the soil evenly on this <br /> area, Mr. Hardesty would have to fill the wetlands. This would require him <br /> to apply for a 404 permit from the U.S. Army Corps of Engineers. Filling in <br /> vernal pools clearly runs contrary to the Resource Agencies' goal of <br /> preserving this resource. If Mr. Hardesty attempts to stockpile the dirt around <br /> the wetland areas, this would adversely affect both the hydrology of the <br /> wetlands and existing or potentially existing wetland species. Most <br /> particularly, the tiger salamander uses upland vernal pools to breed.. The <br /> tiger salamander is a candidate for federal listing and state species of special <br /> concern. <br /> 4/12/93 <br /> File No. SA-92-0041/Hardesty —3— <br />
The URL can be used to link to this page
Your browser does not support the video tag.