Laserfiche WebLink
L.- 4 <br /> 3.6 Discussion of General Area Septic Tank Repair History: Repair history of the septic <br /> tanks in this area reveals that the leach lines and seepage pits have resulted in consistent unerring <br /> performance. This is based on the fact that all repairs were performed over 10 years or later. <br /> 3.7 Description of proposed or Expected Maximum(including <br /> secod unit second unn s)septic <br /> tank usage on site. The two parcels will have only primary <br /> ngs <br /> are planned,thus only one septic system per parcel is anticipated dente at this time. <br /> and . Per Coun unit <br /> ordinances, each parcel on this map is entitled to one primary <br /> resdwelling. Therefore this project could ultimately have 4 homes on the two proposed parcels. <br /> 10 GROUNDWATER INFORMATION SECTION: <br /> 4.1 Description of the depth and gradient of groundwater in the general area: The depth to <br /> .. ground water in this area is approximately 110 feet according to the map of"Lines of Equal <br /> Depth to Groundwater" published Spring, 1999,by the San Joaquin County Flood Control and <br /> Water Conservation District. The gradient descends from east to west. <br /> 4.2 Description/Discussion of any existing and/or potential groundwater contamination <br /> issues in the general location of the site: The concerns for groundwater nd fertilizers typically <br /> contamination in this <br /> area is deemed low due to the depths involved. Insecticides,pesticides, <br /> do not impact groundwater at these depths,however, as with any agricultural area,there is <br /> always potential for contamination due to chemicals used in the farming operation. <br /> 4.3 Description of location, type and construction of well and location where water <br /> sample(s)were obtained: Water samples were taken from a well head at a P.G.&E. substation <br /> across the street from the project site on May 16, 2005 by Mike Toy of Dillon &Murphy. The <br /> water samples were obtained at this location due to the fact there are no outlets for water on the <br /> project site. The sample site is across from the project site. <br /> 4.4 Description of constituents being tested for in the water sample: The water samples are <br /> being tested for nitrates and DBCP. The results for dibromochloropropane (DBCP)were 0.131 <br /> ug/L and the results for nitrates were 9.77 mg/L. <br /> 4.5 Description of how sample was obtained,handled, stored, and transported to the lab: <br /> ` The water samples were obtained from a well head at a P.G.&E. substationacross <br /> doss from <br /> the to <br /> project site. The samples were taken by Mike Toy of Dillon &Murphy, <br /> Precision Enviro-Tech. ken <br /> Enviro-Tech requirements.Thesamples <br /> result from the test can be found n the Appendix. <br /> dled in accordance with recision <br /> 2 c:\0423\Soil Report <br />