Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K.Heran R.E.H.S. <br /> ".< 304 East Weber Avenue,Third Floor Carl Huggins, <br /> R. .H.S., S. <br /> � Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • Cq,. .O_:,��P• Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> 4 r• a Laurie A.Cotalla,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClellon, E.H. <br /> Program Manager Mark Bazcellos,R.E.H.S. <br /> April 22. 2002 <br /> TO: San Joaquin County <br /> Community Development Department <br /> FROM: San Joaquin County <br /> Environmental Health Department <br /> CONTACTPERSON: Raymond Borges, Lead Senior R.E.H.S., R.D.I. 9t' <br /> PHONE NUMBER: (209) 468-3284 <br /> RE: PA-02-86 (MS),Attention: Rick Griffin <br /> 21461 East Kettleman Lane,Lodi <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> S/ !A soil suitability study, as required by Section 9-1105.2 (d) of the San Joaquin County <br /> Development Title, indicating that the area is suitable for a septic tank system must be <br /> performed prior to recordation of Parcel Map. A review fee of$178.00 is required at time of <br /> submittal to the Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of <br /> septic tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal <br /> system is required for each parcel. A permit fee of$89.00 per percolation hole is required. <br /> _:�-5?0,,,—. The existing private water wells shall be tested for the chemical Dibromochloropropane <br /> (DBCP) and nitrates prior to recordation of the Parcel Map. Samples are to be taken and <br /> analyzed by a State-approved laboratory. (San Joaquin County Development Title, Section <br /> 9-1115.7). <br /> Applicant will need to upgrade water well on Parcel #1 with appropriate sanitary seal and <br /> pressure tank system to serve home on proposed Parcel#1 Prior to recordation of Parcel <br /> Map. Applicant can have an individual water well constructed under permit and inspection <br /> by Environmental Health Department on Parcel#1 prior to recordation of Parcel Map (San <br /> Joaquin County Development Title, Section 9-1115.3). <br /> Page 1 of 2 FWR <br />