Laserfiche WebLink
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY............................................................................................1 <br /> Introduction ................................................................................................................1 <br /> ProposedDevelopment.............................................................................................1 <br /> SiteDescription..........................................................................................................1 <br /> PastUses of the Site..................................................................................................2 <br /> Existing and Proposed Septic Tank Usage......................................................... 2 <br /> Existing Septic System ....................................... ..............................2 <br /> Proposed Septic System.................................................. --...........2 <br /> On-Site Septic Permit History........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity...................................__.............3 <br /> Septic Permit History in the Vicinity...............................................................3 <br /> Expected On-Site Maximum Septic Tank Usage...........................................3 <br /> Ground Water Information.........................................................................................3 <br /> Depthand Gradient................................................................................ ......3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells.................................................... 4 <br /> WaterSample................................................................................................4 <br /> Soil Profile and Geologic Information ......................................................................5 <br /> Soil Borings.............. ..6 <br /> Discussion of Soil Lithology..................... .....................................................6 <br /> PercolationTest.........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes..............................6 <br /> Percolation Test Procedure............................................................................6 <br /> Percolation Test Results.,.................................................. 7 <br /> Discussion of Percolation Test Results.. ...................................... .......8 <br /> Discussion of Septic System Sizing...............................................................8 <br /> CONCLUSIONS AND RECOMMENDATIONS ...............................................................9 <br /> LIMITATIONS................................................................................................................1 U <br /> SELECTED REFERENCES ..........................................................................................11 <br /> LOGE 1118 <br />