My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t r r r r r r r r <br /> Table 3.H-1. Estimated Consumptive Use of Water during Active Dry Pit Mining <br /> Water Use/Demand(acre-foot per year) <br /> Irrigation(use ET <br /> Mining Crop of 1.7 acre-foot per Processing Storage Pond Total <br /> Stage Assumptions Acreage year for almonds) Material Evaporation Consumption <br /> I-A Subtract 10 acres for processing plant and 10,000 sq. ft.of buildings,and 42 165 281 425 0 706 <br /> acres South Pit from premining crop acreage <br /> I-B Same as Stage I-A but also subtract North Pit 1 area of approximately 41.3 124 211 425 238 874 <br /> acres from crop acreage;evaporation from North Pit 1 <br /> 11-A Same as Stage I-B;but no evaporation from either pit 124 211 425 0 636 <br /> 11-B Same as Stage I-B;but evaporation from South Pit 124 211 425 242 878 <br /> 111-A Same as Stage II-B but subtract North Pit 2 acreage(38.7 acres)from crop area 127 215 425 242 882 <br /> and reclaim North Pit 1 (41.3 acres) <br /> III-B Same as Stage 111-A but also subtract North Pit 3 acreage(35 acres)from crop 130 221 425 242 889 <br /> area and reclaim North Pit 2(38.7 acres) <br /> IV-A South Pit reclaimed(42 acres);portion of North Pit 3 (10.2 acres)is reclaimed 183 311 0 143 454 <br /> (Pond) and remainder is used as Ag Pond(24.8 acres of evaporation) <br /> IV-B Same as Stage IV-A except all of North Pit 3 will be reclaimed(no evaporation) 208 353 0 0 353 <br /> (No Pond) <br /> Notes: Consumptive use calculations <br /> Assumption: Assume entire 217.5 acre land parcel is used for almond orchards until receive more accurate value. <br /> Step l: Premining Condition <br /> Use ET of 1.7ac-ft per acre <br /> 370 ac-ft/yr <br />
The URL can be used to link to this page
Your browser does not support the video tag.