Laserfiche WebLink
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Public Services and Utilities <br /> 7. All development shall be consistent with the County's waste management <br /> plans. <br /> Public Health and Safety <br /> Fire Safety and Law Enforcement <br /> Objective 1.To provide fire protection and law enforcement for the public's <br /> health and safety. <br /> 2. To prevent fire and law enforcement hazards through physical planning. <br /> Policies: Fire Safety _ <br /> 1. The fire protection and law enforcement services and facilities shall provide <br /> adequate protection throughout the county,including waterways used by <br /> boaters. <br /> 5. All development shall have adequate access for fire fighting and emergency <br /> equipment. <br /> Implementation <br /> 1. Project Review. Fire and law enforcement hazards shall be determined in <br /> project review and shall be prevented or mitigated to acceptable levels of <br /> risk. (Planning,Planning Commission,Board of Supervisors,Fire Warden, <br /> Sheriff) _ <br /> 3. Fireflows. Fireflow requirements shall be established by the county for <br /> water systems for each type of land use.(Fire Warden) <br /> Impact Analysis <br /> Approach and Methodology <br /> The impact analysis is based on the proposed facilities and activities and whether <br /> they would result in impacts to public service providers. This section describes <br /> the methods used to determine the potential impacts of the Project on fire <br /> protection, law enforcement,energy,water, wastewater, solid waste, and road <br /> maintenance services. Measures to mitigate (avoid,minimize,rectify,reduce, <br /> eliminate, or compensate for) significant impacts accompany each impact <br /> discussion. Hazardous material response services are discussed in section 3.I, <br /> "Surface Water, Stormwater, and Water Quality"and water quality is discussed <br /> in section 3.G, "Groundwater and Groundwater Quality." <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 3.K-6 <br /> As 05105.05 <br />