My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Environmental Setting,Impacts,and Mitigation Measures <br /> Development Department Transportation and Traffic <br /> Table 3.11-48. Vernalis Aggregate Production Sites Year 2027 Baseline Conditions Hourly Truck Loading <br /> Frequencies and Estimated Hourly Truck Generation <br /> Total Peak Year 2027 Daily Two-Way Truck Trips: 6,966 <br /> Hourly Truck %of Total Daily Hourly Truck %of Total <br /> e <br /> AM Period Trips Trips PM Period Trips Daily Trips <br /> 12:00-1:00 21 0.3% 12:00-1:00 536 7.7% <br /> 1:00-2:00 21 0.3% 1:00-2:00 557 8.0% <br /> r 2:00-3:00 21 0.3% 2:04-3:00 446 6.4% <br /> 3:00-4:00 56 0.8% 3:00-4:00 299 4.3% <br /> 4:00-5:00 181 2.6% 4:00-5:00 168 2.4% <br /> 5:00-6:00 432 6.2% 5:00-6:00 77 1.1% <br /> 6:00-7:00 698 10.0% 6:00-7:00 63 0.9% <br /> 7:00-8:00 703 10.1% 7:00-8:00 63 0.9% <br /> 8:00-900 676 9.7% 8:00-900 56 0.8% <br /> 9:00-10:00 613 8.8% 9:00-10:00 35 0.5% <br /> r <br /> 10:00-11:00 648 9.3% 10:04-11:00 35 0.5% <br /> 11:00-12:00 536 7.7% 11:00-12:00 28 0.4% <br /> Source: Omni-Means 2005. <br /> L <br /> The estimated distribution of the truck traffic that would be generated by the year <br /> 2027 was estimated through review of general forecasted market area <br /> information provided by individual aggregate producers and other available trip <br /> ` distribution estimates. Table 3.L-19 shows the projected year 2027 study area <br /> truck trip distribution percentages(Ornni-Means 2005). <br /> L Table 3.11-49. Year 2027 Aggregate Truck Trip Distribution <br /> Direction Initial Distribution(%) Secondary Distribution(%)' <br /> ` Westbound on SR 132 to 1-580 40% <br /> Northbound on I-580 40% <br /> Eastbound on SR 132 to I-5 60% <br /> Eastbound on SR 132 beyond 1-5 14% <br /> Northbound on I-5 41% <br /> Southbound on I-5 5% <br /> Total 100% 100% <br /> Source: Omni-Means 2005. <br /> Figures showing the projected year 2027 baseline AM and PM peak hour traffic <br /> volumes and the projected year 2027 baseline daily traffic volumes can be found <br /> in Appendix F,Figures 13 and 14. <br /> ` DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 31-17 <br /> J85 05105.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.