My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c � <br /> Phase 2A: Mine Stage 1 of North Pit to groundwater. Backfill.South.Plt with <br /> overburden and.fines to 15 feet above groundwater. <br /> 'Phase 2B:Mine Stage 1 o North Pio to design depth. Store groundwater in _ <br /> South Pit. <br /> Phase 3A Mine Stage 2 of North Pit to design-depth. Backfill Stage 1 of North <br /> Pit with overburden and fines to 15feetabove groundwater and replace topsoil. <br /> Store groundwater in;South Pit <br /> Phase 3B:`Mine"Stage 3 of North Pit to design depth.-Backfill Stage 2 of North <br /> Pit with overburden and fines to 15 feet above groundwater. Replace topsoil. <br /> Store'groundwater in South Pita <br /> Phase 4: Stage 3 of North Pit remains.:as pond for agricultural use (elevation 75 <br /> feet), Stage 1 and Stage 2 of North Pit backfilled to 15 feet above groundwater <br /> (elevation 90;feet-Final Reclamation):: South Pit backfilled to 15 feet above <br /> groundwater(elevation 9t)feet). Replace topsoil., <br /> The final reclaimed pits.will be backfilled to approximately ninety (90) feet AMSL for all <br /> disturbed areas (excluding the potential water storage pond for agricultural use), or . <br /> approximately 80-90 feet below surrounding properties elevations. Reclaimed side' <br /> slopes and pits will be replaced with eighteen(.18) 'inches of topsoil that will be stored o <br /> site during mining <br /> Proiect Size: - <br /> 217.5 acres. Excavation will occur on approximately 155 acres and a processing plant <br /> will be constructed on approximately 10 acres of the project site. Reclamation will occur <br /> on all 165 acres of disturbed land. <br /> Proiect Location: <br /> The project site is located on the west side of Koster Road (east of the Delta Mendota <br /> Canal) between Vernalis Road(State Route 132) and Blewett Road, southeast of Tracy_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.