My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blewett Road was improved within the last 10-years to a two-lane, 48-foot wide paved roadway (two 20- <br /> foot travel lanes with 4-foot shoulders). At the same time, the section of Bird Road from the intersection <br /> with Blewett Road north to the intersection with SR-132 was improved to a two-lane,40-foot wide paved <br /> roadway(two 16-foot travel lanes with 4-foot shoulders). To the north of SR-132,Bird Road is generally <br /> a two-lane road with a 24 foot paved width with no paved shoulders. The Bird Road intersection with <br /> SR-132 is located approximately 2'/4-miles east of I-580 and approximately 1-mile west of I-5. The <br /> intersection is a four-way at-grade intersection with stop sign control for traffic entering from both legs of <br /> Bird Road. <br /> Blewett Road is a two-lane east/west county local rural road which extends from Bird Road in San <br /> Joaquin County cast to SR-33 in Stanislaus County. Blewett Road between Koster Road west to the <br /> approaches to the Blewett Road over crossing over I-5 and from just to the west of the California <br /> Aqueduct bridge to Bird Road has a 20-22 foot paved width with no shoulders. The segment from the <br /> approach to the over crossing over I-5 to the west end of the California Aqueduct bridge generally has a <br /> 28-30 foot paved width including 2-3 foot paved shoulders. Blewett Road intersects Koster Road <br /> approximately 1-mile south of SR-132 at a four-way at-grade intersection with stop sign control for traffic <br /> entering from both legs of Blewett Road. Blewett Road also intersects Bird Road approximately I-mile <br /> south of SR-132 at a "T" intersection with stop sign control provided on the Blewett Road intersection <br /> approach. Approximately 100-feet of Blewett Road at the approach to Bird Road was reconstructed when <br /> Bird Road was improved. <br /> STUDY AREA INTERSECTIONS AND ROADWAY SEGMENTS <br /> The following study area intersections and roadway segments were identified for evaluation during both <br /> the AM and PM peak study hours. <br /> • Intersections: <br /> • SR-132/BirdRoad <br /> • Bird Road/Blewett Road <br /> • Koster Road/Blewett Road <br /> • Koster Road/New Quarry Entrance(with project only) <br /> • Roadway Segments: <br /> • SR-132 west of Bird Road <br /> • SR-132 between Bird Road and I-5 <br /> • SR-132 east of I-5 — <br /> • Koster Road between Blewett Road and SR-132 <br /> • Blewett Road between Koster Road and Bird Road <br /> • Bird Road between Blewett Road and SR-132 <br /> In addition, and as relevant to this study, peak hour operations at the I-5/SR-132 interchange are <br /> described. _ <br /> EXISTING TRAFFIC VOLUMES <br /> As part of the traffic forecast update for the SR-132/Bird Road Interchange Project Report, peak period <br /> intersection counts were collected at the Route 132/Bird Road intersection on Wednesday, May 4, 2004. <br /> Intersection turning movement counts were collected during the AM hours between 5:00 and 8:00 a.m. <br /> and during the PM hours between 2:00 and 6:00 p.m. Based on the review of this data, the AM peak hour <br /> 2"d Draft DeSilva Gates Quarry Trafc&Circulation Analysis 6 October 2005 <br /> Jones&Stokes (R905TIS002/25-4000-02) <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.