YEAR 2007 BASE TRAFFIC OPERATIONS _ <br /> The SR-132/Bird Road Interchange Project Report has identified and evaluated three interchange design <br /> alternatives (Alternative 1 through Alternative 3). Alternative 1 represents a "diamond" interchange <br /> alternative concept, Alternative 2 represents a modified"par-cloe" interchange concept and Alternative 3 <br /> is a combination of Alternatives 1 (to the south of Route 132) and Alternative 2 (to the north of Route <br /> 132). The year 2007 AM and PM peak hour traffic volumes for each interchange alternative are shown <br /> on Figure 8. The proposed design Alternative I through Alternative 3 intersection approach geometries - <br /> for both Bird Road intersections with the SR-132 ramps are shown on Figure 9. <br /> Intersection Operations: Intersection operations for the three interchange design alternatives were - <br /> evaluated utilizing the Traffix-7.6 traffic operations analysis program. A rural peak hour factor (PHF) of <br /> 0.88 was assumed for both ramp intersections with Bird Road. Table 14 presents the projected year 2007 <br /> base intersection operations for all three design alternatives. Forecasted intersection operations shown in _ <br /> the table are based on stop sign control on the respective eastbound and westbound SR-132 off ramp <br /> approaches to Bird Road. As shown in Table 14, the SR-132 ramp intersections with Bird Road are <br /> projected to operate at LOS `B" or better during both the AM and PM peak hours under all three design _ <br /> alternatives. As also shown in Table 14, the Blewett Road intersections with Bird Road and Koster Road <br /> are projected to operate at LOS"AB"for both peak hour periods. <br /> TABLE 14 <br /> YEAR 2007 BASE PEAK HOUR INTERSECTION OPERATIONS <br /> XVITII PROPOSED SR-132/BIRD ROAD INTERCHANGE(ALTERNATIVES I THROUGH 3) <br /> Alternative 1 Alternative 2 Alternative 3 <br /> AM Peak Hour PM Peak Hour AM Peak PM Peak Hour AM Peak PM Peak Hour <br /> Hour flour <br /> Delay LOS Delay LOS Delay LOS Delay LOS Delay I LOS Delay LOS <br /> WB 132/Bird Road 11.4 B 9.9 A 9.8 A 9.6 A 9.8 A 9.6 A <br /> Ram s' <br /> EB 132/Bird Road ]0.1 B 9.6 A 10.1 B 9.7 A 10.1 B 9.6 A <br /> am <br /> Rs' _ <br /> Bird Rd' 10.3 B 10.0 B 10.3 B 10.0 B 10.3 B 10.0 B <br /> Blewettd.•ett R <br /> Koster Rd./ 9.7 A 9.0 A 9.7 A 9.0 A 9.7 A 9.0 A <br /> BlewettRd.• <br /> •-Intersections evaluated m Two Way Stop Control intersections with stop-signs on minor road approaches <br /> LOS-Minor Street Approach Level of Service for Two-way-stop-controlled intersections <br /> Freeway Weaving Segment Operations: Table 15 presents the projected weaving operation between the <br /> I-5/SR-132 and SR-132/Bird Road interchanges. As part of the interchange project, an auxiliary lane will <br /> be constructed between the southbound I-5 direct off ramp to westbound SR-132 and the westbound SR- <br /> 132 off ramp to Bird Road. An auxiliary lane will also be constructed between the Bird Road on ramp to <br /> eastbound SR-132 and the eastbound SR-132 direct off ramp to southbound I-5. The weaving evaluations <br /> assume that these auxiliary lanes are in place and available for weaving. <br /> 2nd Draft DeSilva Gates Quarry Trafc&Circulation Analysis 20 October 2005 <br /> Jones&Stokes (R90577S002/15-4000.01) <br />