My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 38 <br /> YEAR 2027 PLUS PROJECT AGGREGATE TRUCK TRIP DISTRIBUTION <br /> Direction Distribution % '.Distribution <br /> Westbound on SR 132 to I-580 400/6 . <br /> Northbound on I-580 40% <br /> Eastbound on SR 132 to 1-5 Go% <br /> Eastbound on SR 132 beyond I-5 14% <br /> Northbound on I-5 41% <br /> Southbound on I-5 5% _ <br /> Total 100% 100% <br /> Figure 16 shows the projected year 2027 plus project AM and PM peak hour traffic volumes while - <br /> Figure 17 shows the projected year 2027 plus project daily traffic volumes. <br /> YEAR 2027 PLUS PROJECT TRAFFIC OPERATIONS - <br /> As previously noted, the SR-132/Bird Road Interchange Project Report has identified and evaluated three <br /> interchange design alternatives (Alternative 1 through Alternative 3). The year 2027 plus project AM and <br /> PM peak hour traffic volumes for each interchange alternative are shown on Figure 18. The proposed <br /> design Alternative 1 through Alternative 3 intersection approach geometries for both Bird Road <br /> intersections with the SR-132 ramps are shown on Figure 9. - <br /> Intersection Operations: Table 39 presents the projected year 2027 plus project intersection operations <br /> for all three design alternatives. As shown in Table 39,the SR-132 ramp intersections with Bird Road are - <br /> projected to operate at LOS "D" or better during both the AM and PM peak hours under all three design <br /> alternatives. As also shown in Table 39,the Blewett Road intersections with Bird Road and Koster Road <br /> are projected to operate at LOS "B" or better during both peak hours. Finally, the project entrance <br /> driveway is projected to operate at LOS"A"during both peak hour periods. <br /> TABLE 39 <br /> YEAR 2027 PLUS PROJECT PEAK HOUR INTERSECTION OPERATIONS <br /> WITH PROPOSED SR-132/BIRD ROAD INTERCHANGE ALTERNATIVES I THROUGH 3) <br /> Alternative 1 Alternative 2 Alternative 3 <br /> AM Peak PM Peak Hour AM Peak PM Peak Hour AM Peak PM Peak Hour <br /> Hour flour I Hour <br /> Delay LOS Delay LOS Delay LOS Delay LOS Delay I LOS Delay LOS <br /> WB SR 132/Bird 27.2 D 11.4 B 11.4 B 10.1 B 11.4 B 10.1 B <br /> Road Ram s• _ <br /> EB SR 132/Bird 14.0 B 10.7 B 14.2 B 11.3 B 14.0 B 10.7 B <br /> Road Ram s* <br /> Bird Rd./ 14.1 B 11.4 B 14.1 B 11.4 B 14.1 B 11.4 B <br /> Blewett RV - <br /> Koster Rd./ 11.5 B 9.4 A 11.5 B 9.4 A 11.5 B 9.4 A <br /> Blewett Rd.* <br /> Koster Rd./ I Q.5 A 8.4 A 8.5 A 8.4 A 8.5 A 8.4 A <br /> Project Entrance.* - <br /> *-Intersections evaluated as Two Way Stop Control Intersections with stop-signs on minor road approaches <br /> LOS-Minor Street Approach Level of Service for two-way-stop-controlled intersections <br /> 2n°Draft DeSilva Gates Quarry Trafc&Circulation Analysis 40 October 2005 <br /> Jones&Stokes (R905TIS002/25-4000-02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.