My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 — Fugitive PM10 Sources — Page 3 <br /> 3-E Bulk Materials (Rule 8021 Sec:6.3.6.6 and Rule 8031) <br /> Outdoor Handling of Bulk Materials. (Rule 8031 Sec.5.0A) <br /> ❑ No bulk materials will be handled during this project. <br /> ❑ Water or dust suppressants will be applied when handling bulk materials. I <br /> ❑ Wind barriers with less than 50 percent porosity will be installed and maintained, and water or dust <br /> suppressants will be applied. r <br /> Outdoor Storage of Bulk Materials. (Rule 8031 See.5.0 B) I <br /> ❑ No bulk materials will be stored during this project. <br /> ❑ Water or dust suppressants will be applied to storage piles. <br /> ❑ Storage piles will be covered with tarps, plastic, or other suitable material and anchored in such a manner <br /> that prevents the cover from being removed by wind action. <br /> ❑ Wind barriers with less than 50 percent porosity will be installed and maintained around the storage piles, <br /> and water or dust suppressants will be applied. I <br /> ❑ A three-sided structure (< 50% porosity)will be used that is at least as high as the storage piles. <br /> On-Site Transporting of Bulk Materials. (Rule 8031 Sec.5.0 c) <br /> ❑ No bulk materials will be transported on the project site. <br /> ❑ Vehicle speed will be limited on the work site. <br /> ❑ All haul trucks will be loaded such that the freeboard is not less than six inches when transported across <br /> any paved public access road. <br /> ❑ A sufficient amount of water will be applied to the top of the load to limit visible dust emissions. <br /> ❑ Haul trucks will be covered with a tarp or other suitable cover. r <br /> Off-Site Transporting of Bulk Materials. (Rule 8031 Sec.5.0 0) I <br /> ❑ No bulk materials will be transported to or from the project site. <br /> ❑ The following practices will be performed: (complete Section 5-B) 7 <br /> • The interior of emptied truck cargo compartments will be cleaned or covered before leaving the site. <br /> • Spillage or loss of bulk materials from holes or other openings in the cargo compartment's floor, sides, <br /> and tailgates will be prevented. <br /> • Haul trucks will be covered with a tarp or other suitable cover or will be loaded such that the freeboard I <br /> is not less than six inches when transported on any paved public access road to or from the project <br /> site and a sufficient amount of water will be applied to the top of the load to limit visible dust <br /> emissions. <br /> Outdoor Transport using a Chute or Conveyor. (Rule 8031 Seo.5.0 E) <br /> ❑ No chutes or conveyors will be used. <br /> ❑ Chute or conveyor will be fully enclosed. <br /> ❑ Water spray equipment will be used to sufficiently wet the materials. <br /> ❑ Transported materials will be washed or screened to remove fines (PM10 or smaller). <br /> 3-F Comments i <br /> I <br /> I <br /> 10/14/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.