Laserfiche WebLink
Spinardi Associates <br /> Ms. Kerry Sullivan <br /> San Joaquin County <br /> December 17, 2001 <br /> Page 2 <br /> M. FIGURES <br /> Figure 1 Vicinity Map <br /> Figure 2 Property Ownership Map <br /> Figure 3 Phasing Plan - Master Sheet <br /> Figure 4-12 Phasing Plan I - D{ <br /> _ Figure 13 Mining Plan <br /> Figure 14 Reclamation Plan <br /> Figure 15 Cross Sections <br /> Figure 16 Slope Detail <br /> Figure 17 Plant Layout (Plan View) <br /> Figure 18 Plant Layout (Overview) <br /> W. TABLES <br /> Table 1 Reclamation Schedule <br /> The Geotechnic Report, by Geomatrix Consultants will be send under separate cover. If you have <br /> questions regarding this package or need additional copies, please call me. We look forward to a <br /> successful permitting process. <br /> Sincerely, <br /> SPIN'AARRDI ASSOCIATES <br /> Karen Spinardi <br /> cc: Butch Kelly, RMC Pacific Materials, Inc. <br />