The same emission factor is applied to all materials - aggregate, asphalt, and <br /> concrete. Clearly, the moisture content would vary among these materials. Thus, <br /> more than one emission factor should be used to accommodate the differences. _ <br /> Third, this emission factor applies every time a material is handled. The Draft EIR <br /> assumes all materials are handled only once. This is unlikely. The various materials 6-35 <br /> would be handled multiple times. Fourth, the calculations assume 75 percent control cont <br /> with no discussion of how it will be achieved or any requirement that it actually be <br /> achieved. This is an extraordinarily high control efficiency for handling and storage <br /> achieved using watering, the only fugitive dust control measure mentioned in the — <br /> Draft EIR. (Draft EIR, p. 3-15.) Again, we were unable, given the time constraints, to <br /> untangle these various messes and determine what the handling and storage <br /> emissions should be. <br /> IV.D.4 Quarry Processing PM 10 Emissions _ <br /> The quarry processing emissions — from various feeders, conveyors, screens, <br /> washers, and crushers — were incorrectly calculated in the Draft EIR. The Excel <br /> spreadsheet in Exhibit 1 (Estimated PM10 Emissions from Quarry Processing <br /> Operations - Baseline) calculated that the quarry would operate 500 hours per year, <br /> assuming a design rate of 8,000 tons per hour and an annual production rate of <br /> 4.0 million tons. The 500 hours were then accidentally treated as days and used to <br /> calculate annual emissions in tons per year. <br /> Notwithstanding this error, the fundamental approach used to calculate <br /> quarry emissions is flawed. The calculations first assume a production rate, in this <br /> example 4.0 million tons/year. The Draft EIR offers no explanation for this choice, 8 36 <br /> simply stating it as fact. (Draft EIR, pp. 2-1, 3-8.) Justification is warranted because <br /> the capacity of the facility (8,000 ton/hour operating up to 24 hr/day 6 days per <br /> week), the operating lifetime of the mine (26 to 60 yrs), and the size of the in-place <br /> resource (Draft EER, Table 3-1, p. 3-19) suggest that a far larger production rate is <br /> reasonably foreseeable. Next, the design hourly production rate is used to calculate <br /> the number of days per year the quarry would have to operate (the erroneous <br /> calculation) to meet the target production level (4.0 million tons/yr). The _ <br /> assumptions used to calculate the annual throughput should have been disclosed in <br /> the Draft EIR. <br /> The choice of 4.0 million tons per year underestimates emissions from <br /> sources calculated using emission factors expressed as pounds per ton (e.g., <br /> emissions from handling &storage, loadout, storage tanks), but not quarry <br /> processing emissions (due to the offsetting hour-day error discussed above). It also <br /> underestimates traffic and noise impacts. <br /> 26 <br />