My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cemex Vernalis Quarry Mining and Reolamtion Pmject <br /> expected to continue to operate at a level of service D based on near-term-without-Project <br /> conditions.Haul Route 1 is not expected to create new traffic at the intersection and therefore is <br /> not considered to impact the intersection However Haul Route 3 would result only in through <br /> traffic A review of peak-hour traffic signal warrants suggests that traffic signals are not <br /> warranted at the intersection based on existing and near-term-with-Project conditions. <br /> The intersection is expected to operate at a level of service F in the year 2025 even without the <br /> proposed project Haul Route 1 is not expected to create additional impacts in the year 2025 <br /> To mitigate the impacts created by Haul Route 3 on opening day, all-way stop control would be <br /> required However,all-way stop control should not be installed unless warrants are satisfied after <br /> the imposed proiect begins operating Since Haul Route 3 is expected to be an interim altemate <br /> route it is unlikely that warrants for all-way stop control will be met on a long-term basis. <br /> Therefore,this impact may be considered adverse but not significant. <br /> To mitigate the cumulative impacts with Haul Route 3 in the year 2025, all-way stop control with <br /> construction of a westbound left-tum lane is expected to be required. As an altemative to <br /> mitigating cumulative year 2025 conditions,the proposed project may be conditioned to eliminate <br /> Haul Route 3 after the construction of the Bird Road/SR 132 interchange,at which time only _ <br /> Haul Route 1 would be allowable. <br /> Intersection of SR 132 and Vernalis Road (Connector to SR 33) <br /> The analyses indicate that the intersection of SR 132 and Vemalis Road is currently operating at a <br /> level of service F The existing substandard level of service is primarily a result of the difficulty <br /> encrienced by vehicles attempting to turn left across traffic on SR 132. The proposed haul routes <br /> do not propose left tums at the intersection. Haul Route 1 and Haul Route 3 will result only in <br /> additional through movements on SR 132. Therefore, Project-specific significant impacts are not <br /> identified. ~ <br /> Intersection of Welty Road and Blewett Road _ <br /> The analyses indicate that the intersection of Welty Road and Blewett Road is currently operating <br /> at acceptable levels of service and is expected to continue to operate at acceptable levels of <br /> service based on the near-term and cumulative conditions. — <br /> Intersection of SR 33 and Welty Road <br /> The analyses indicate that the intersection of SR 33 and Welty Road is currently operating at <br /> acceptable levels of service and is expected to continue to operate at acceptable levels of service <br /> based on the near-term without-Project conditions.Haul Route 1 is not expected to create <br /> opening-day significant impacts However Haul Route 3 is expected to result in an opening-day <br /> impact that would require mitigation. <br /> The intersection is expected to operate at a level of service C in the year 2025 without the <br /> proposed project and Haul Route 1 will not create additional impacts in the year 2025. However, <br /> Haul Route 3 would exacerbate the cumulative year 2025 impacts to a level of service F. _ <br /> Cemex Vernals Quarry Miring and Reclamation Project 4-34 ESA 1203=15 <br /> Final Envnonmental Impact Report June 2[x18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.