Laserfiche WebLink
V r f i r r If r I r r u- <br /> 5. <br /> 5.Mitigation Monitoring and Reporting Program <br /> TABLE 5-1 <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> CEMEX VERNALIS QUARRY PROJECT <br /> Mitigation Measure Responsible Monitor Timing Sign Off <br /> Party <br /> service with project implementation,the intersection will require widening to accommodate truck turning or Building Permits <br /> movements if access to the mining site is provided via Koster Road(South Costa Ranch Road).Additionally,all- <br /> way stop control will be required to mitigate this intersection's cumulative year 2025 unacceptable levels of service <br /> impacts from Haul Route 1. If the County allows the use of this site access,the project sponsor would fund its fair <br /> share of this measure as a condition of approval of the project. Peters Engineering Group conducted a Fair-Share <br /> Percentage analysis as part of its Traffic Impact Study forthis project. <br /> 4.4.1b:As a condition of approval,the applicant will be required to contribute an equitable share of the cost of the Ongoing <br /> construction of a new interchange at SR 132 and Bird Road. Applicant's payment of its equitable share will be <br /> made through the creation of a CFD according to the County's June 6,2008 Acceptance of Petition from the <br /> Vernalis Producers Group to Form a Community Facilities District,or other similar financing mechanism. Caltrans <br /> has approved a Project Study Report for an interchange to replace the existing intersection. The proposed <br /> interchange is expected to mitigate the cumulative impacts to the intersection(for Haul Route 1). <br /> 4.4.1c:As a condition of approval,the applicant will be required to contribute an equitable share of the cost of <br /> installing new traffic signals and construction of a separate southbound left-turn lane and protected left-turn <br /> phasing at the intersection of Bird Road and Blewett Road.Traffic signal warrants must be satisfied at this <br /> intersection for implementation of this measure.These proposed improvements are expected to mitigate the Once warrants met <br /> cumulative impacts to the intersection(for Haul Route 1). <br /> 4.4.1d: The proposed project will be conditioned to operate at a maximum annual production of 1.33 million tons <br /> while Haul Route 3 is in operation. If the proposed project is limited to 1.33 million tons per year,the near-term <br /> with-Project level of service will be C and no significant impacts will occur.To mitigate significant impacts in the <br /> cumulative conditions,the proposed project may be conditioned to eliminate Haul Route 3 after the construction of Until Birdl132 interchange <br /> the Bird Road/SR 132 interchange,at which time only Haul Route 1 would be allowable. built <br /> 4.4.1e: In order to address safety concerns associated with Haul Route 3 through the SR 33/Welty Road <br /> intersection,the proposed project will be required to implement the following improvements to this intersection to <br /> the extent feasible: <br /> • Construct 4-foot shoulders beyond the outermost truck wheel tracks. <br /> • Reconfigure intersection striping to prevent turning trucks from crossing over double yellow stripes. <br /> • Install signage to warn trucks about blocking the railroad tracks.Consult with Union Pacific regarding any <br /> additional measures needed. <br /> • Reconfigure traffic stripes and trim or remove trees and vegetation to eliminate horizontal sight distance <br /> constraints. <br /> • Construct acceleration and deceleration lanes at the intersection for trucks turning right onto southbound <br /> Welty and northbound trucks turning left onto State Route 33. <br /> Cemex vem ks Quarry Mining and Redamation Projec[ 5-3 ESA/203015 <br /> Final Enyimnmental Impact Report June 2009 <br />