Laserfiche WebLink
s <br /> x. CULTURAL. RESOURCES: The excavator shall cease all construction and excavation work <br /> immediately upon the discovery of cultural resource material. Such work shall cease until the <br /> excavator has complied with the requirements of Appendix K of the CEQA Guidelines. <br /> y. INDEMNIFICATION: The owner shall defend, indemnify, and hold harmless the local agency or its <br /> agent and employees from any claim, action or proceeding against the local agency or its agents, <br /> officers, or employees to attach, set aside, void, or annul an approval of the local agency, advisory <br /> agency, appeal board, or legislative body concerning this Quarry Excavation permit. <br /> z. SEDIMENTATION POND DIKE DESIGN:A registered engineer shall design the proposed <br /> sedimentation pond dike. The design of the dike shall be reviewed and approved by an independent <br /> engineering or geo-technical firm selected by the Community Development Department. Said review <br /> shall be at the expense of the applicant. No more than fifty(50)acre feet of water shall be stored <br /> against said dike. <br /> 2. DEPARTMENT OF PUBLIC WORKS <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer and include the following: <br /> (1) Detail of access road(first 100 feet from either Koster Road or Blewett Road shall be paved. <br /> (2) Haut route. <br /> (3) Stockpile area for topsoil. <br /> (4) Any stockpile or excavation shall be 25 feet clear of the Koster Road right-of-way. <br /> b. Loads shall be restricted to legal loads only. (Streets and Highway Title Section 10-2350) I'I <br /> c. A video tape of road conditions on Koster Road, Blewett Road, and Bird Road, along the haul route, <br /> is required prior to the start of excavation. The condition of these roads shall be reviewed with the <br /> Department of Public Works prior to the start of excavation and every five years thereafter. <br /> (Development Title Section 9-1415.2) <br /> d. A Maintenance Agreement to ensure that Koster Road (including bridges), Blewett Road, and Bird <br /> Road are maintained to a condition acceptable to San Joaquin County shall be exec�cvuted b finalized <br /> between the applicant and the County. The ""^1etepanre Agreement shall be reRewed eyeF:r_Fe..e <br /> yeaF6. <br /> with!he Department witha qUaFaRtee that, it the PeFmittee fails, refuses, 9F ne9IeGt6 t9 FepaiF, undeF <br /> peFmit, any damages to KesteF Read, Blewett Read, eF Bird Read, whiGh May FeSult ft_ _A4-PeFMi#e9' <br /> bFidges equal to, 9F betteF than, M 0Fj9iF;a1 rGOGIR&IGA, USOR9 the 411REIS ftGA;Said band OF rash deposit, <br /> ) <br /> e. The Traffic Impact Mitigation fee will be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee currently is$168.90 per daily trip-end in the Tracy <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. <br /> San Joaquin County QX-96-11DSS Company <br /> Community Development Page 11 <br />